Design and install V4 Superchargers
V4 cabinets and V4 posts: stall layouts, bollards, wire runs, trenching, clearances, and what changes for the Semi Megacharger. Study here, then test yourself.
Study notes built from Tesla's V4 Supercharger documents. Always design to the current Tesla documents, the stamped plans, and the AHJ.
Flashcards
Tap a card to flip it. Mark what you know and what needs another look.
Quiz
Watch an install
Hit play, or drag the timeline. Each stage shows what's happening, and exactly what goes in the ground and in the conduit.
Assumptions: a restaurant parking lot, one V4 cabinet (1500 A, 480 V 3-phase), 4–8 posts behind the curb, right-justified, ≈100 ft from cabinet to the farthest post, asphalt lot, no surprises underground. Sizing follows the Tesla recommendations in this guide; your engineer of record has the final say.
Ask
Ask anything about the material. Claude answers from this guide and the Tesla V4 documents, with page references.
Answers are AI-generated from the guide's material and can be wrong. Check the source page before designing, and follow the stamped plans and the AHJ.